Skip to content
Air Conditioning

Brands we install and supply

Chosen to suit how the building is used and the budget it is built to, with parts and service centres available in Thailand.

  • Daikin
  • Mitsubishi Electric
  • Carrier
  • Hitachi
  • LG
  • Haier
  • York
  • Hisense

Air conditioning

Sizing it right the first timecosts less than fixing it later

Design, installation, cleaning, repair and relocation for homes, condominiums, offices and commercial buildings — quoted from a cooling load calculation rather than a guess at the room size.

What we take on

New installations

New installations

Site survey, load calculation, pipework, installation, commissioning

Cleaning and maintenance

Cleaning and maintenance

Coils, drain trays and filters cleaned, refrigerant pressure checked

Repair and diagnosis

Repair and diagnosis

Poor cooling, water leaks, unusual noise, compressor faults

Relocation

Relocation

Removal, new pipework, recharge and testing

How many BTU does the room need

BTU measures cooling capacity. Undersize it and the unit runs constantly without cooling the room, driving the bill up and shortening the life of the compressor. Oversize it and the unit cycles off before it has pulled the moisture out, leaving the room cold but damp — and costing more to buy than it needed to. The table below is a starting point for an ordinary bedroom or living room in a house.

Add capacity when

  • The room takes afternoon sun or has large glazing
  • It sits on the top floor under the roof
  • Several people use it at once, regularly
  • There is a cooker, oven or other heat-producing equipment
  • The ceiling is higher than 2.6 metres
Room sizeCapacityTypically
12–15 sqm9,000 BTUSmall bedroom, studio condominium
16–20 sqm12,000 BTUStandard bedroom, home office
21–28 sqm18,000 BTULarge bedroom, medium living room
29–35 sqm24,000 BTULiving room, open plan onto a kitchen
36–44 sqm30,000 BTULarge hall, small retail unit
45–55 sqm36,000 BTURetail, open plan office

Use this to budget. The actual selection comes from orientation, glazed area, ceiling height and occupancy — not from a fixed figure per square metre.

How often should it be cleaned

Dust on the coil reduces how much heat the unit can exchange, so it works harder for the same cooling. The bill rises before anyone notices the room feels warmer.

  • Ordinary household

    Every 6 months

    A few hours of use a day, normal dust

  • Rooms run most of the day

    Every 4 months

    Bedrooms left on overnight, homes with pets

  • Offices and shops

    Every 3–4 months

    Frequent traffic, doors opening and closing

  • Restaurants and dusty sites

    Every 2–3 months

    Cooking vapour, smoke, or construction dust nearby

Beyond cleaning, have the refrigerant pressure and compressor current checked once a year. A slow loss of refrigerant usually shows no symptom until the compressor begins to suffer for it.

Signs worth calling about early

  • It cools more slowly than it used to at the same setting
  • Water drips from the unit, or a stain appears on the ceiling
  • Unusual noise from the outdoor unit
  • A musty smell every time it starts
  • The bill rises with no change in how it is used
  • The compressor cycles more often than before

From the site

Work you can see, not just a promise

Air conditioning is not judged on the day it is installed but on the day a technician opens it up years later. These photographs are what the work actually looks like — in plant rooms, on rooftops, and under office ceilings that are sheeted over before any cleaning begins.

01 · 11 photos

Cleaning indoor units without the mess

Every clean starts with a catch bag under the unit and sheeting over the floor and furniture before the evaporator coil is washed at the right pressure. Blower wheels and drain trays are removed and cleaned separately, so the air runs cold again and the smell is gone — and the room is left as clean as it was found.

02 · 10 photos

Rooftop condensing units

Outdoor units sit in sun and rain all year and are the part most often forgotten. Dirt packed into the fins makes the compressor work harder and quietly raises the bill. Fins are washed from the inside out, and the refrigerant lines and mountings are checked every visit.

03 · 7 photos

Large systems in the plant room

Offices and commercial floors often run floor-standing units ducted across a whole level. Here the filters come out to be washed, large coils are cleaned and the duct insulation is inspected — one unit cools an entire floor, and when it stops the whole building feels it.

04 · 5 photos

Measuring before things fail

Many faults show no symptom until something breaks. Refrigerant pressure is read on gauges, control panels are checked, and wall-mounted outdoor units are inspected. Finding a small leak or a loose electrical connection early costs a fraction of a new compressor.

05 · 8 photos

After handover

What the owner sees is a level installation, pipework and cabling dressed neatly, and no water marks on the ceiling — wall-mounted, ceiling-suspended and four-way cassette units, each fitted to suit the interior around it.

Common questions

How long does one installation take

A typical household installation with a short pipe run takes half a day to a day per unit. Drilling through concrete, concealing pipework in a ceiling, or fitting several units at once is quoted with a firm schedule after the survey

Does relocating a unit always need a recharge

If the refrigerant is pumped down into the outdoor unit properly before removal, usually not all of it. A longer pipe run than before, or a leak found on removal, does need topping up to the actual length

Can I clean it myself

The air filter, yes — and it is worth doing monthly. The evaporator, condenser and drain tray need a pressure washer and dismantling; water in the wrong place damages the control board

Repair the old one or replace it

Past about ten years, on discontinued R22 refrigerant, and with a repair costing more than half a new unit, replacing usually wins once the saved electricity is counted

Do you take on large buildings

Yes — VRV / VRF systems, ductwork and ventilation for offices, hotels and factories, designed alongside the architecture from the drawing stage

Let us look at the site first

The survey costs nothing. We measure the space, check the orientation and the electrical supply, and set out the options with the trade-offs of each before any price is discussed.